Not only a roof, a whole second floor up there! This picture is from Monday morning. Our contractor worked over the weekend to keep us from freezing (more) than we already were. To be fair, he warned us it was going to be like living in a war zone once the roof started to come off.
I have two batches of beer in progress at the moment. The first was
supposed to be a Scottish Wee Heavy, but due to technical difficulties during the mash, it ended up a lot lighter and therefore hoppier than I had intended. The hose connecting the false bottom to the outlet valve came loose, and I had to dump out all the grain, reconnect the hose, add more water to keep the grain bed floating, the dump all the grain back in. Only to discover that some grain had got stuck in the valve, and I had to do it all over again. So it ended up with about a gallon of extra water in it.
That batch got bottled last night. It looks pretty good. I'd noticed earlier a problem with haze, and added some Sparkalloid,
which took everything out of suspension, leaving really bright, clear beer.
The second batch is what the first batch should have been. A nice rich, malty, Scotch Ale. Original gravity of 1.096, which is down to 1.016 right now.
Friday night was Pine Wood Derby night for both of my kids. So, for the past few weeks, on top of all the house construction, we've been working on making little tiny race cars. Michael made it to the semi-finals in his division, Jonathan made it to the finals in his, where he came in second and got a medal. Michael was a bit disappointed. We'll have to work harder next year.
The bedroom closet is switching from the bedroom (soon to be living room) to the other side, where it will be my closet in my new office. They framed it, and later they'll put up the new sheetrock there, with a door on the other side.
This is actually from a few weeks ago. When this is all done, we'll have a whole new second floor of the house. Until then, we have an ongoing disaster.
The first step was taking down the central wall on the first floor, and putting in steel beams.
This means that our living room is also now the bedroom.
They also put in new steel beams in the basement, to hold the whole house up.
This was all before the blizzard hit. At least we hadn't taken the roof off at that point.
This is most of the computers that used to be in my office upstairs. The upstairs office doesn't exist anymore (see next few posts), and will eventually be our new bedroom. So for now, all the equipment is on the bar in the basement.