{"id":199766,"date":"2007-06-28T06:05:00","date_gmt":"2007-06-28T11:05:00","guid":{"rendered":"https:\/\/www.panix.com\/~msaroff\/40years\/2007\/06\/28\/first-completed-boeing-787-leaves-assembly-hall-for-paint-shop-27-06-2007-flightglobal-com\/"},"modified":"2007-06-28T06:05:00","modified_gmt":"2007-06-28T11:05:00","slug":"first-completed-boeing-787-leaves-assembly-hall-for-paint-shop-27-06-2007-flightglobal-com","status":"publish","type":"post","link":"https:\/\/www.panix.com\/~msaroff\/40years\/2007\/06\/28\/first-completed-boeing-787-leaves-assembly-hall-for-paint-shop-27-06-2007-flightglobal-com\/","title":{"rendered":"First completed Boeing 787 leaves assembly hall for paint shop-27\/06\/2007-Flightglobal.com"},"content":{"rendered":"<p>My money is that there will be some delays in deliveries of the aircraft, and then the bankers wringing their hands over Airbus, will whine about boeing.<br \/><a href=\"http:\/\/www.flightglobal.com\/articles\/2007\/06\/27\/215216\/pictures-first-completed-boeing-787-leaves-assembly-hall-for-paint.html\"><\/a><\/p>\n<blockquote style=\"color: rgb(0, 0, 153);\"><p><span style=\"font-size:130%;\"><a style=\"font-weight: bold;\" href=\"http:\/\/www.flightglobal.com\/articles\/2007\/06\/27\/215216\/pictures-first-completed-boeing-787-leaves-assembly-hall-for-paint.html\">PICTURES: First completed Boeing 787 leaves assembly hall for paint shop<\/a><\/span><\/p>\n<p>Flightglobal.com has obtained pictures of the first Boeing 787 Dreamliner headed for the paint shop earlier this week at Boeing&#8217;s assembly plant in Everett, Washington. The aircraft is scheduled to be formally rolled out on 8 July (7\/8\/7 using the US date convention) and fly for the first time in August or September. Entry into service with launch customer, All Nippon Airways, is slated for next May.<\/p>\n<p><img decoding=\"async\" src=\"http:\/\/img512.imageshack.us\/img512\/3567\/getassetzy5.gif\" \/><br \/>&#8230;<\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>My money is that there will be some delays in deliveries of the aircraft, and then the bankers wringing their hands over Airbus, will whine about boeing. PICTURES: First completed Boeing 787 leaves assembly hall for paint shop Flightglobal.com has obtained pictures of the first Boeing 787 Dreamliner headed for the paint shop earlier this &hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1007,1005],"tags":[],"class_list":["post-199766","post","type-post","status-publish","format-standard","hentry","category-aviation","category-business"],"_links":{"self":[{"href":"https:\/\/www.panix.com\/~msaroff\/40years\/wp-json\/wp\/v2\/posts\/199766"}],"collection":[{"href":"https:\/\/www.panix.com\/~msaroff\/40years\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.panix.com\/~msaroff\/40years\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.panix.com\/~msaroff\/40years\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.panix.com\/~msaroff\/40years\/wp-json\/wp\/v2\/comments?post=199766"}],"version-history":[{"count":0,"href":"https:\/\/www.panix.com\/~msaroff\/40years\/wp-json\/wp\/v2\/posts\/199766\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.panix.com\/~msaroff\/40years\/wp-json\/wp\/v2\/media?parent=199766"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.panix.com\/~msaroff\/40years\/wp-json\/wp\/v2\/categories?post=199766"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.panix.com\/~msaroff\/40years\/wp-json\/wp\/v2\/tags?post=199766"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}